|



|
Experience That Counts
- Apex is an established quality resource for project engineering
and project control

- Extensive Dry Bulk Material Handling project experience
- New systems, retrofits, debottlenecking, stretches, modernization
and upgrades

- Comprehensive skill sets and an experienced staff
(Top of Page)
Apex has a highly experienced engineering staff representing multiple
engineering disciplines including mechanical, civil, electrical,
controls and industrial. Some of the engineering staff have over
25 years of bulk handling experience.

(Top of Page)
The partial listing herein provides a brief description of
representative projects. These projects were performed by Apex
Bulk Technologies and/or Apex Engineering personnel during both prior
employment and employment with Apex. Apex is proud that our
success stems from repeat business from satisfied clients. All
project costs are in US Dollars and are approximate.
|
Industry
|
Project Description
|
Capital
Cost
|
|
|
|
|
|
Catalyst
|
Warehouse and Bulk Material Handling System
|
$3,500,000
|
|
|
|
|
|
Clay
|
45 Degree Cleated Belt Conveyor
|
$150,000
|
|
|
|
|
|
Coal
|
Replace Belt on 72" 5 Mile Overland Conveyor
|
$3,000,000
|
|
|
|
|
|
Coal
|
Coal Handling and Storage DCS Control System
|
$180,000
|
|
|
Location: Illinois.
|
|
|
|
|
|
|
Coal
|
Coal Yard Material Handling and Dust Control
|
$100,000
|
|
|
|
|
|
Coal
|
Coal Concrete Silos, Reclaim Tunnels, and
Stacking Tubes
|
$250,000/ea
|
|
|
Location: Wyoming, Kentucky, West Virginia,
Colorado, and Ohio
|
$4,000,000
|
|
|
|
|
|
Coal
|
Four-1200TPH Coal Conveyors
|
$750,000
|
|
|
|
|
|
Coal
|
Six-500 TPH Coal and Limestone Conveyors
|
$800,000
|
|
|
|
|
|
Coal
|
Coal Conveyor
|
$500,000
|
|
|
|
|
|
Coal
|
Barge Loadout Conveyor |
$300,000 |
|
|
Location: Kentucky |
|
|
|
|
|
|
Coal
|
Boilerhouse Wood Chip and Coal Conveyors
|
$2,000,000
|
|
|
|
|
|
Coal |
Coal Refuse Overland Conveyor |
$300,000 |
|
|
Location: Kentucky |
|
|
|
|
|
|
Coal |
Truck Unloading, Conveying, and Barge Loadout |
$6,000,000 |
|
|
Location: West Virginia |
|
|
|
|
|
|
Coal |
2000' Slope Belt from Mine Portal with Transfer Tower |
$3,000,000 |
|
|
Location: Kentucky |
|
|
|
|
|
|
Coal |
Three Mile Overland Conveyor for Run of Mine Coal with Reclaim Tunnel,
Stacking Tube, Magnetic Separators, and Dust Suppression |
$10,000,000 |
|
|
Location: Kentucky |
|
|
|
|
|
|
Coal |
Clean Coal Overland Conveyor with Transfer Tower, Stacking Tube, Feeders,
Magnetic Separator, Belt Scales, Sampling System, Mooring Cells, and
Barge Loadout rated at 3,800 TPH |
$15,000,000 |
|
|
Location: Kentucky |
|
|
|
|
|
|
Coal |
Screening and Loadout Structure Feed Conveyor |
$500,000 |
|
|
Location: Kentucky |
|
|
|
|
|
|
Coal |
New Mine Development including Feeder-Breaker Equipment, Conveying,
Screening, Radial Stacker, Reclaim Tunnel with Feeders, and Truck
Loadout |
$10,000,000 |
|
|
Location: Western U.S. |
|
|
|
|
|
|
Coal |
Coal Fired Utility Conveyor System Upgrade |
$50,000 |
|
|
Location: Indiana |
|
|
|
|
|
|
Fertilizer
|
Belt Conveyors
|
$350,000
|
|
|
Location: Texas |
|
|
|
|
|
|
Metals
|
Carbon Solids Handling and Dust Collection
|
$8,000,000
|
|
|
|
|
|
Metals
|
Furnace Feed Cleated Belt Conveyors
|
$400,000
|
|
|
Location: Indiana |
|
|
|
|
|
|
Metals
|
Furnace Feed Cleated Belt Conveyors
and Storage System
|
$800,000
|
|
|
Location: Kentucky |
|
|
|
|
|
|
Petroleum Coke |
Conveying System and Railcar/Truck Loadout Location:
California |
$1,000,000 |
|
|
|
|
|
Power
|
Fuel Blending Control System
- PLC and HMI
|
$375,000
|
|
|
|
|
|
Power
|
Coal Dust Suppression System
|
$350,000
|
|
|
|
|
|
Power
|
Fuel Handling Conveyor
|
$300,000
|
|
|
Design and engineering of a fuel handling conveyor.
|
|
|
|
|
|
|
Power
|
Dust Control and Collection
|
$250,000
|
|
|
|
|
|
Sand
|
Foundry Sand Batch Delivery System
|
$500,000
|
|
|
Location: Tennessee |
|
|
|
|
|
|
Wood Chips
|
Wood Chip Conveyor
|
$500,000
|
|
|
Location: Kentucky |
|
|
|
|
|
|
Wood Chips
|
Bark Drying and Classification Belt Conveyors
|
$550,000
|
|
|
Location: California |
|
|
|
|
|
|
Wood Chips
|
Wood Fines Handling, Transfer, and Storage System
|
$750,000
|
|
|
Location: Virginia |
|
|
|
|
|
|
Utilities
|
Boilerhouse
Expansion
|
$11,600,000
|
|
|
|
|
|
Utilities
|
Air Separation Unit
Engineering and Design
|
$10,000,000
|
(Top of Page)
|